Blasdell to Berthold 115 kV Transmission Line Project

Client: Basic Electric Power Coop.

Location: North Dakota

Completion Date: February 2014

Scope/Description:

  • 18 miles of new 115 kV construction
  • Poles = single steel direct embeds and foundations
  • Conductor = 795 with 1 OPGW