Nerc Mitigation Stage II Construction Project
Client: Western Area Power Admin
Location: Arizona
Completion Date: March 2017
Scope/Description:
- 32 miles of 230 kV re-conductor and structures
- Poles = existing lattice towers
- Install four new steel pole H-frame direct embeds
- Install 32 miles of new 636 scooter and 954 canvas-back
- Change 91 existent tangent structures to floating dead-end type structures