Micaville 115kV Substation Rebuild

Client: Duke Energy

Location: Micaville, NC

Length: 21 miles

Completion Date: October 2018

Scope/Description:

  • Removal of existing wooden structures and anchors, circuit switcher, 115kV copper bus and insulators, and 12kV capacitor banks
  • Removal and modifications to existing substation infrastructure including oil containment walls, catch basins, substation fencing, transformers, battery box and relay cabinet.
  • Installation of new steel single pole and dead-end structures, underground feeder structure, disconnect and bypass switches, and circuit breakers.