Wheelock to Twelve Mile and Wheelock to Two Mile North

Client: Mountrail – Williams Electric Coop.

Location: North Dakota

Completion Date: May 2013

Scope/Description:

  • 20 miles 115 kV transmission line with three-phase under-build
  • Poles = All laminated single poles
  • Conductor = T2-397 with OPGW